|
|||||||||
| PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||
| SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD | ||||||||
java.lang.Objectorg.treesched.DateUtils
Utility methods to do things with dates and intervals.
| Method Summary | |
static int |
dayOfMonth(java.util.Date inDate)
Calculate the day of the month (1 - 31) for the given date. |
static int |
dayOfWeek(java.util.Date inDate)
Calculate the day number for the given date. |
static int |
dayOfYear(java.util.Date forDate)
Calculate the day of the year for the given date. |
static java.util.Date |
endOfDay(java.util.Date inDate)
Calculate the date time at the end of the day (one millisecond before midnight) for the given date. |
static java.util.Date |
endOfMonth(java.util.Date inDate)
Calculate the date at the end of the month for the given date. |
static java.util.Date |
endOfYear(java.util.Date inDate)
Calcuate the date at the end of the year from the given date. |
static int |
month(java.util.Date inDate)
Calcuate the month number (0 - 11) for the given date. |
static java.util.Date |
oneMillisAfter(java.util.Date date)
Return a date which is 1 millisecond after the given date. |
static java.util.Date |
oneMillisBefore(java.util.Date date)
Return a date which is 1 millisecond before the given date. |
static java.util.Date |
startOfDay(java.util.Date inDate)
Calculate the start of day date time (i.e. |
static java.util.Date |
startOfMonth(java.util.Date inDate)
Calculate the date at the start of the month for the given date. |
static java.util.Date |
startOfYear(java.util.Date inDate)
Calculate the date at the start of the year for the given date. |
| Methods inherited from class java.lang.Object |
clone, equals, finalize, getClass, hashCode, notify, notifyAll, toString, wait, wait, wait |
| Method Detail |
public static java.util.Date startOfDay(java.util.Date inDate)
inDate - The date to cacluate start of day from.
public static java.util.Date endOfDay(java.util.Date inDate)
inDate - The given date.
public static int dayOfWeek(java.util.Date inDate)
inDate - The given date.
public static int month(java.util.Date inDate)
inDate - The given date.
public static int dayOfMonth(java.util.Date inDate)
inDate - The given date.
public static java.util.Date startOfMonth(java.util.Date inDate)
inDate - The given date.
public static java.util.Date endOfMonth(java.util.Date inDate)
inDate - The given date.
public static int dayOfYear(java.util.Date forDate)
forDate - The date.
public static java.util.Date startOfYear(java.util.Date inDate)
inDate - The given date.
public static java.util.Date endOfYear(java.util.Date inDate)
inDate - The given date.
public static java.util.Date oneMillisAfter(java.util.Date date)
date - The given date.
public static java.util.Date oneMillisBefore(java.util.Date date)
date - The given date.
|
|||||||||
| PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||
| SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD | ||||||||